Tree Surveys for Construction Sites
We have decades of combined experience in dealing with and managing trees close to or affecting planning applications.
We work with you and your design team to provide positive outcomes, whether you are adding an extension to an existing building, proposing a multi-unit scheme or dealing with a large infrastructure project, we have the experience to help.
- Feasibility of Development
- BS5837 Tree Survey for Planning
- Arboricultural Impact Assessment
- Tree Protection Plans
- Tree Management Plans
- Arboricultural Method Statement
How can we help?
As one of the region’s leading Arboricultural Consultancy firms, we often encounter urgent requests due to planning applications already being underway. This urgency arises because the Local Planning Authority may raise concerns about trees and development, potentially causing delays, application revocation, or even refusal.
To avoid these issues and ensure trees and associated constraints are appropriately considered, we recommend reviewing the information below or visiting our guide on the ‘ideal’ approach to commissioning tree assessments for prospective developments.
Our Arboricultural Assessments can be provided as standalone reports or aligned with the Royal Institute of British Architects (RIBA) Plan of Work (2020). For more details, see the link below:
Trees and Development: A Guide to Commissioning Tree Surveys in Line with BS5837 (2012) and the RIBA Plan of Work (2020).
Tree information for development sites typically falls into four key parts, with the first two focusing on ‘Pre-Planning Approval.’ These provide the essential data that local planning authorities require to make informed decisions.
Tree information for development sites generally falls into three main parts. The first two parts deal with ‘Pre-Planning Approval’ and provide the information that a local planning authority typically needs to enable them to make an informed decision.
Part 1 – Arboricultural (Tree) Constraints, Feasibility, and Opportunities Survey
Part 2 – Arboricultural Impact Assessment and Technical Design
The final parts deal with the information required for ‘Post-Planning Approval’ to ensure that any planning conditions can be met and signed off. Information is provided to ensure the technical design and the construction phase can be achieved.
Part 3 – Arboricultural Method Statement, in addition to Arboricultural Supervision
BIM – Building Information Modelling
BIM (Building Information Modelling) focuses on seamless data sharing and collaboration. We actively share and coordinate our information with consultants and team members, helping to reduce costs and streamline project delivery. Additionally, we can provide bespoke plots and visuals tailored to your specific needs upon request.
Stay Informed.
Get the Latest on Tree Surveying Tools and Training
Check Out Our Blog
Products update
PenetroLOG Digital Soil compaction meter – Quick and Easy
Arbshow 2025
Arborsonic software updates and Dynaroot updates can all be discussed with Ian Barnes and his team at the Arbshow 2025






